INSTALLATION SYSTEM
Installation in forward sequence
Embed the f irst post using quick set
concrete . Slot the f irst panel into the
grooves in the post provided for this
purpose
Slot the second post onto the panel by
rotating it and f it the wedges Repeat the
operation and remove the wedges after
the concrete has set
Place the panel wires in the post grooves .
Position the AXOR ® wedges to make it
easier to position and tension the panels
between the posts while the concrete
sets Also compatible with the DIRICKX
universal wedge
The f inal panel sometimes needs to be cut
to achieve the exact required length
1 2
3 4
Installation with Ronce barbed wire ,
Tigre / Concertina
or AXIS
®
D panel
Installation recommendation Add a
reinforcement when installing with
extension arms
Single or double extension arms
OPTIONS
AVAILABLE
1
ST
QUARTER OF 2026
20 26
Posts for panel fencing
AXOR
®
PLUS slotted post
COMBINED WITH AXOR
®
PLUS POSTS / AXOR
®
CHIC AND AXIS
®
D , AXYLE
®
MS , CS , MD AND CD
FLAT PANELS DEPENDING ON THE TYPE OF INSTALLATION ( EXCLUDING PRIVACY SYSTEMS )
NOMINAL FENCE
HEIGHT ( m )
POST LENGTH ( M )
LONG EMBEDDING
( 40 to 50 cm )
( 1 )
SHORT EMBEDDING
( 20 to 40 cm )
( 1 )
WELDED
ON BASE PLATE
ON SLEEVE PLATE
ON ANGLED WELDED
BASE PLATE
0 . 60 – 0 . 65 0 . 65 0 . 65
0 . 80 1 . 20 1 . 05 0 . 85 0 . 85 0 . 85
1 . 00 1 . 40 1 . 20 1 . 05 1 . 05 1 . 05
1 . 20 1 . 70 1 . 40 1 . 25 – 1 . 25
1 . 40 1 . 90 1 . 70 1 . 45 – 1 . 45
1 . 50 2 . 00 1 . 90 1 . 55 – 1 . 55
1 . 60 2 . 20 2 . 00 1 . 65 – 1 . 65
1 . 70 2 . 20
–
1 . 75 – 1 . 75
1 . 80 2 . 40 1 . 85 – 1 . 85
1 . 90 2 . 50 1 . 95 – 1 . 95
2 . 00 2 . 50 2 . 05 – 2 . 05
2 . 20 2 . 70 2 . 25 – 2 . 25
2 . 40 2 . 90 – – –
( 1 ) For guidance only : to be adapted to soil and wall type as well as to the installation region .
&