INSTALLATION PROCEDURE
Remove the bands on the heather thatch roll ,
position it vertically along the fence , and unroll
the thatch along the panel .
Start by attaching one of the heather thatch ends
with the integrated twisted wires .
To secure the thatch , f it it using the staples or the
wire twister and double loop ties .
This operation should be repeated every 30
cm over at least three levels To complete the
installation of the thatch f it the other end using
the integrated twisted wires
1
2
3
• 2 choices of tools :
- stapler for UNIVERS post + stainless steel staples
- wire twister and stainless steel and galvanised double loop ties
• 2 possible installations :
- installation on rigid panels
- installation on mesh
RELATED PRODUCTS
Galvanised and stainless steel
loop tie
Wire twister
UNIVERS post
stapler
Stainless steel
staple
Binding wire
&
RIGID PANELS & PRIVACY FENCING
87
www dirickx fr